Minutes:
The Head of Planning and Building Control submitted an update regarding cumulative appeal totals for 2022/23.
The report indicated that 2 appeals had been received in December 2022. No appeals had been withdrawn and 2 appeals had been determined. Of the 2 appeals determined in December 2022, both had been dismissed.
The report also gave the details of cumulative appeals totals for the whole of 2022/23 which indicated that 22 appeals had been decided since 1 April 2022. Of those, 17 appeals (77%) had been dismissed and 5 appeals (23%) had been allowed.
RESOLVED that the update be noted.
Supporting documents: