Minutes:
The Head of Planning and Building Control submitted an update regarding cumulative appeal totals for 2022/23.
The report indicated that 4 appeals had been received in November 2022. No appeals had been withdrawn and 1 appeal had been determined. The 1 appeal determined in December 2022 had been dismissed.
The report also gave the details of cumulative appeals totals for the whole of 2022/23 which indicated that 20 appeals had been decided since 1 April 2022. Of those, 15 appeals (75%) had been dismissed and 5 appeals (25%) had been allowed.
RESOLVED that the update be noted.
Supporting documents: